Good Day Folks,
I am trying to get a feel for what the industry standard retention period is
for engineering and survey documents - here I'm thinking of stamped and
signed submittals or final documents (civil engineering plans, ALTA / ASCM
surveys, records of survey, etc.). If anyone is doing records in these
fields wants to reply to me off list, I would love to hear what duration of
retention you are using. Thanks in advance!
-- Joseph
List archives at http://lists.ufl.edu/archives/recmgmt-l.html
Contact [log in to unmask] for assistance
To unsubscribe from this list, click the below link. If not already present, place UNSUBSCRIBE RECMGMT-L or UNSUB RECMGMT-L in the body of the message.
mailto:[log in to unmask]