Subject: | |
From: | |
Reply To: | |
Date: | Tue, 25 Aug 2009 11:51:12 -0400 |
Content-Type: | text/plain |
Parts/Attachments: |
|
|
Joseph,
That will depend on whether you own the building or you designed (or
constructed) the building. We'll need to know a little bit more about
your organization before we can help you.
Gary Link, CRM
Astorino
Pittsburgh, PA
[log in to unmask]
-----Original Message-----
From: Joseph Morris [mailto:[log in to unmask]]
Sent: Tuesday, August 25, 2009 11:46 AM
To: [log in to unmask]
Subject: [RM] Retention for Engineering and Survey Documents
Good Day Folks,
I am trying to get a feel for what the industry standard retention
period is
for engineering and survey documents - here I'm thinking of stamped and
signed submittals or final documents (civil engineering plans, ALTA /
ASCM
surveys, records of survey, etc.). If anyone is doing records in these
fields wants to reply to me off list, I would love to hear what duration
of
retention you are using. Thanks in advance!
-- Joseph
List archives at http://lists.ufl.edu/archives/recmgmt-l.html
Contact [log in to unmask] for assistance
To unsubscribe from this list, click the below link. If not already
present, place UNSUBSCRIBE RECMGMT-L or UNSUB RECMGMT-L in the body of
the message.
mailto:[log in to unmask]
List archives at http://lists.ufl.edu/archives/recmgmt-l.html
Contact [log in to unmask] for assistance
To unsubscribe from this list, click the below link. If not already present, place UNSUBSCRIBE RECMGMT-L or UNSUB RECMGMT-L in the body of the message.
mailto:[log in to unmask]
|
|
|