Dustin,
To start, consider the regulatory requirements from the below
authorities to assist you in the build out of your taxonomy. All
requirements are searchable online with the exception of NARUC. NARUC
regs are available via their website for $5.00. You should include the
requirements of your state utility commission, statutes, codes and any
additional states in which you operate. If you would like more
information, please contact me offline.
FERC PUHCA 2005 18CFR368.3
NARUC 1985 (National Association of Regulatory
Utility Commissioners)
FERC (electric) 18CFR125.3
FERC (gas) 18CFR225.3
EPA 40CFR
TX Utility Codes/Statutes
TX Statute of Limitations
TX Statute of Repose
Best regards,
Michael Levey
SCANA
Supervisor of Corporate Records
Tel:(803)217-8580
Fax:(803)933-8612
[log in to unmask]
List archives at http://lists.ufl.edu/archives/recmgmt-l.html
Contact [log in to unmask] for assistance
To unsubscribe from this list, click the below link. If not already present, place UNSUBSCRIBE RECMGMT-L or UNSUB RECMGMT-L in the body of the message.
mailto:[log in to unmask]