Thanks, Ginny!
He's been keeping those, as well as drawings of the process. His reasoning was
that sometimes the final building wasn't really built "as built" and he needed to
backtrack through the drawings to figure something out, like a pipe angled a
certain way.
Would you keep more than 1-2 copies of the "as built" and electrical/plumbing
drawings?
Best, Jennifer